Happy Birthday Kim!
Today I rode home quickly, it had cooled down significantly from the extreme humidity from this morning. I was disappointed not to see ‘the guys’. Although it was obvious work had been done, the amount was not as exciting as previous days. It looks like the drywall is taking a bit to dry, but hopefully with the break in the humidity, it should be a lot faster now!
The hardwood floors arrived and are sitting in the dining room. The dry wallers have put another coat of mud and patched up all the straggler holes.
I am really really really hoping the floors go in tomorrow, as the varnish curing is really a crap shoot on timing. Next week everything comes together!
The guys prepped the basement for receipt of the concrete (Thursday?).