It’s Saturday and they are working!!

Sunday, July 22, 2007

Still working through the dialup…photos added from work.
It’s the day before my birthday, 8:30am on a lovely Saturday morning and there is a flurry of activity in the house. Cabinet guys are back and they are ready to install the uppers. I can hardly wait. The kitchen is really coming along, and it looks amazing. I keep having to pinch myself to make sure I am not dreaming. I truly regret my Mom will not be able to see it. We would have had such good times cooking together. Not sure if it’s the stress of the reno, or my birthday (tomorrow) but I am surely missing her so much these days. There were a few issues with the uppers’ measurements so they could not finish…Monday???? The Toddster has promised plumbing by Wednesday (apparently the plumber won’t come out until the powder room is ready to be plumbed!)

uppersinstalled.jpg
uppersinstalled2.jpg

Todd and his cousin Terry came in today to get a head start on the basement (putting up the vapor barrier in the basement, cutting a hole in the house for the hood fan in the kitchen, time consuming but necessary stuff). They stayed ‘till after 4pm – he is a good guy, we are glad he is on our project!
JT was trying to get the Nuvo stereo system working. We’ve confirmed that it does indeed work a few times by hooking up speakers and the ipod to it, but now it’s in the walls and we’re having an issue…I’m sure he’ll figure it out. It’s quite a complicated system using category 6 cables (similar to DSL) – each room has a control panel from which you are able to control each component you add (CD player, tuner, Ipod etc.). The main amplifier/controller allows each room to be controlled separately, so in one room, you could have the Ipod going, the other the CD player! We likely won’t use it to that degree (but if you had kids, this system would be great!). I am excited about it because you are able to control sound individually in each zone/room!
I was outside cleaning up the bricks for next week (Maddy the brick layer was in on Friday to get a sense of what needs to be done – he has time Tuesday/Wednesday/Thursday – strange how they cannot say a specific date!). I’ve done several options for the brick heights in Photoshop and I think we’ve decided on 10 high. (insert photo).
John is taking me to The Fifth for my birthday dinner tonight. I got reservations in Summerlicious again and it’s at 9:30, so they likely won’t rush us since we are the last sitting. It’s down on Adelaide on the 5th floor above a club.


The countertops go in

Sunday, July 22, 2007

I still don’t have my high speed internet connection. I am VERY frustrated. Who would have thought I am so dependant on this stupid connection.

Thursday, the cabinet guys arrived to install the bottom cupboards (due to the fact that we have a couple of cupboards extending all the way to the counter, we could not install the uppers until the counter was installed!). Unfortunately, there was an error and they had to go back to the shop to fix it. They will arrive at 7am Friday to finish installing so that the soapstone guy could install all day Friday.

kitchenready1for-counter.jpg

kitchenready2for-counter.jpg

kitchenready3for-counter.jpg

kitchenready4for-counter.jpg

kitchenready5for-counter.jpg

Friday and there is a lot of activity at the house. Cabinet guys are completing the base cabinets.

Soapstone guys canadiansoapstone.com arrive a bit early (they are from Ottawa and came down last night). Cabinet installers are still working. We chat with the guys (father, son and family friend). They are very nice people. They wait and wait for the cabinet guys to finish.
Once done, they take over the kitchen. The installation takes all day. I am very glad we are around as there are several issues we need to take care of and decide upon. It will be lovely.

soapstoneinstallation1.jpg

soapstoneinstallation2.jpg
The island is a little larger than we anticipated…mainly due to the doors adding extra inches, the over hang adding extra inches, nothing we cannot live with, but had we had a real kitchen designer (oh, did I not mention that the kitchen designer isn’t really a kitchen designer?) we would not have had these issues! It will still be very beautiful.
Todd is on his own again today. I don’t know where Brett is, but he is not here (I guess George doesn’t think we need to finish this sooner than later). Todd is not feeling very well still…a summer cold, which is really crappy. But he is a trooper and is working hard. The basement is framed and almost insulated (insert photo), and Anthony (who now legally is permitted to work here, with all electrical permits taken out) is working hard to electrify the basement as per plan. It’s all coming together.
George is still conspicuously absent. It is MIND NUMBING that he hasn’t felt the need to come over to console this last major blowout (electrical permits). But I haven’t been able to access email, so who knows what’s going on there! I am posting this from dialup and it’s pretty slow to say the least. Photos were posted several days later from work.

The soapstone guys finish at 7:30 pm. Todd stayed behind to catch up, then left shortly after. Barb and Kevin kindly invited us to dinner which is great…I have no more energy. I need a vacation!

soapstoneinstalled.jpg

soapstoneinstalled2.jpg